Princess Hill Tunnel FW
MAIN CINTRACTOR/END CLIENT
DRAGAGES
PRoject description
Supply of steel structure for 2 self-supporting tunnel formworks. 13m wide x 12m long and a variable height between 6.0m and 7.3m., including a complete trial assembly at the workshop. The equipment was used for the construction of the upper slab of the Princess Hill tunnel, Hong Kong.