New Tappan Zee Bridge

New York, USA
2014
CLIENT 
OM Engineering
MAIN CINTRACTOR/END CLIENT
Tappan Zee Constructors, LLC (TZC)
TONNAGE
770
PRoject description
Supply of 8 nos. self climbing jump form systems for construction of the concrete main pylons. Part of the construction of concrete twin span cable stay bridge across the Hudson (main span 366m) with H shaped concrete pylons of height 121m. The steel structure was prefabricated in China, and shipped to site in standard 40" GP containers.